![]() I crossed a major hurdle with the home gym progress last night. As of last night, all of the trim is painted, all of the stripes on the walls have been touched up, and the outlet plates have been installed and painted. This was beginning to feel like the never ending painting project, so I’m very relieved and excited to finally have this done! I originally painted these striped walls in June 2021, and then the room sat unfinished as I turned my attention to the master bathroom remodel. But if you want to see how I did the stripes, you can check out the DIY process here. When I started working on this room again, after finishing the bathroom remodel, things looked like this… About half of the trim around the ceiling had been installed, so I still needed to install the rest, wood fill, sand, caulk and paint. All of the door and window trim had been installed and wood filled, but it still needed to be sanded, caulked, and painted. And then the walls needed a ton of touchups. Here’s a bit of irony. I initially wanted to install crown molding in this room, but after installing […] The post A Major Home Gym Milestone — The Walls & Trim Are Finished! appeared first on Addicted 2 Decorating®. Via https://www.addicted2decorating.com/a-major-home-gym-milestone-the-walls-trim-are-finished.html
0 Comments
Leave a Reply. |
REBECCA ROGERSInterior Design Sales Professional at IKEA Miami Home Furnishings Archives
February 2019
Categories |